Distribution networks with multiple facilities face material supply challenges. Each location needs protective material, but producing at every facility duplicates equipment investment. Shipping purchased void-fill to multiple locations adds freight costs and requires inventory management at each site. A centralized production approach can reduce costs but requires equipment capable of sustaining high output.


    The Aircosan P80 supports centralized production with high-capacity output. This industrial unit processes up to 20mm thickness capacity, with 55cm width and 15 meters per minute speed. The honeycomb mesh produced can be distributed to multiple facilities within the network. The unit runs continuously to maintain material supply across the entire distribution network.


    Aircosan operates our own manufacturing facility, also producing systems up to 120cm wide. The P80's heavy-duty construction reflects engineering for sustained centralized production. The motor handles extended running hours, and the cutting system maintains consistent output quality for all network locations.


    For distribution network managers, the P80 enables centralized material supply. One production unit supports multiple facilities, reducing total equipment investment. Compared to operating shredders at each location, the P80 reduces equipment costs and maintenance requirements. The centralized approach also simplifies quality control, ensuring consistent material across all facilities. The P80 helps distribution networks reduce material costs and simplify supply management while maintaining consistent protection across all locations.